Room-in-roof insulation in Keady
We fit room-in-roof insulation for homes in Keady and across County Armagh, starting with a free survey and a fixed written quote.
We cover postcodes including BT60, which fall under Armagh City, Banbridge and Craigavon council.

Where we work around Keady
Keady is about 18 miles from Craigavon as the crow flies.
We also cover Armagh.
| Postcode districts | BT60 |
|---|---|
| Council area | Armagh City, Banbridge and Craigavon |
| County or area | County Armagh |
What is room-in-roof insulation?
Most rooms-in-roof are reached by stripping the existing plasterboard on the slopes, fitting insulation between and over the rafters, and re-boarding. The room will need redecorating. More about room-in-roof insulation.
- Boarding and finishing as agreed on the quote
- Insulation to slopes, knee walls and flat ceiling
- Eaves voids insulated where accessible
Why book with us in Keady
Photos of the finished loft
You see the work done without climbing the ladder.
Clear contact details
Your quote says who to call with questions before, during and after the work.
We measure before we quote
Existing depth, joist spacing, wiring and the tank are checked, not guessed.
Plain-English advice
We explain what we find in plain English, and say so when nothing needs doing.
How much does room-in-roof insulation cost in Keady?
Part of this work can be zero-rated as energy-saving materials until 31 March 2027, and part is standard-rated. If VAT applies, your quote shows which is which.
Building regulations in Northern Ireland
Northern Ireland has its own Building Regulations, with energy guidance in Technical Booklet F1. Upgrading loft insulation may count as a thermal alteration, so check with your council's building control. How the rules work across the UK.
Questions about room-in-roof insulation in Keady
Do you cover all of BT60?
Yes, we cover the BT60 postcode district and the districts around Keady.
What do I need to do before you arrive in Keady?
Clear a path to the hatch and, if you can, move stored items away from the area we will be working in. Tell us about anything heavy or fragile.
Can a landlord in Keady book work for a tenanted house?
Yes. We can arrange access with the tenant directly and send you photos once the work is finished.
Will the room get smaller?
Slightly. Insulated plasterboard over the rafters takes a few centimetres off each slope.
How long does room-in-roof insulation take?
Usually three to six working days for one room, depending on how much is stripped and how it is finished.
