Loft insulation top-up in Coventry
Homes in Coventry get the same service as everywhere else we work in the West Midlands. For a loft insulation top-up, that means a free survey and a fixed written quote.
We cover the CV1, CV3 and CV5 postcode districts, in the Coventry council area.

Where we work around Coventry
Coventry sits about 17 miles from Birmingham, measured in a straight line.
We also cover Solihull, Acocks Green and Washwood Heath.
| Postcode districts | CV1, CV3, CV5, CV6 |
|---|---|
| Council area | Coventry |
| County or area | West Midlands |
What is a loft insulation top-up?
Before we quote we measure the existing layer in several places and check its condition. If it is wet, dirty, matted or full of droppings, laying fresh wool on top just buries the problem, so we say so and price removal instead. More about a loft insulation top-up.
- Gaps in the existing layer filled
- Eaves ventilation kept clear
- Depth check and photos before and after
Why book with us in Coventry
Tidy work
Dust sheets on the route in and every bit of packaging taken away.
Honest about grants
If you might qualify for funding, we tell you before we quote.
No pressure selling
You get everything in writing and decide in your own time.
Boarding done properly
Storage boards go on loft legs, never straight onto the insulation.
How much does a loft insulation top-up cost in Coventry?
Installing insulation in a home is zero-rated for VAT until 31 March 2027 and 5% after that, under HMRC's rules for energy-saving materials (notice 708/6).
Building regulations in England
In England, a loft insulated across more than half its area should reach a U-value of 0.16 W/m²K. Insulation alone is not usually notified to building control. How the rules work across the UK.
Questions about a loft insulation top-up in Coventry
Will I get a written quote for work in Coventry?
Yes. Every quote is in writing with the work, the price and what is included, so you can compare it properly.
How do I pay for work in Coventry?
Payment terms are set out on your quote. We never ask for payment on the doorstep or in cash.
How soon can you visit a home in Coventry?
We call you back to agree a time that suits you, and confirm the date in writing. Availability changes week to week, so we will give you the earliest slot we have.
Is it worth topping up 100 mm of loft insulation?
Often, if the existing layer is in good condition and you also want a warmer house or a better EPC. On bill savings alone, a top-up from about 100 mm takes decades to pay back, so the case is strongest when it is done alongside other loft work.
Which way should the top-up layer run?
Across the joists, at right angles to the first layer. That covers the tops of the joists, which otherwise let heat escape along the timber.
